Projects

The pipeline behind the numbers

Three development projects with a combined capital cost of US$1,470m. Each project moves through the same four stages, and every stage change is published.

Pipeline

Studies → permitting → construction → production

Filter the pipeline by stage. The track marks where each project stands today.

Showing 3 of 3 projects

Projects by stage, with location, capital cost, annual capacity and the stage each one has reached.
Project Location Capital cost Annual capacity Stage
Wilga Creek Stage 2 Lithium Australia · updated 14 September 2026 US$310m 150 kt SC6 Construction
Salar del Halcón Lithium Argentina · updated 30 June 2026 US$520m 25 kt LCE Permitting
Cerro del Viento Underground Copper Peru · updated 5 May 2026 US$640m 60 kt Cu Studies

How projects advance

What each stage means

Studies

Scoping and pre-feasibility work: drilling, hydrogeology, metallurgy and capital estimates narrow the options.

Permitting

Environmental review, water concessions and community consultation, culminating in the permits to build.

Construction

Civil works, equipment delivery and commissioning, with the workforce peaking well above steady state.

Production

Ramp-up to nameplate capacity, after which the project becomes an operation on the map.