Copper · Peru
Matawara
Open pit, leach and SX/EW. First production is planned for 2026.
Ramp-up Copper
- 0 kt
- FY2025 production
- 12.1 yr
- Reserve life at 8.0 Mtpa
- 2.35
- AISC, $/lb
- 940
- People, incl. 55% contractors
Matawara production per quarter from FY2024 Q1 to FY2026 Q2, in kt Cu.
View quarterly production — kt cu as a table
| Period | kt Cu |
|---|---|
| 2024 Q1 | 0.0 kt |
| 2024 Q2 | 0.0 kt |
| 2024 Q3 | 0.0 kt |
| 2024 Q4 | 0.0 kt |
| 2025 Q1 | 0.0 kt |
| 2025 Q2 | 0.0 kt |
| 2025 Q3 | 0.0 kt |
| 2025 Q4 | 0.0 kt |
| 2026 Q1 | 2.1 kt |
| 2026 Q2 | 5.8 kt |
| Category | Tonnes | Grade |
|---|---|---|
| Probable | 96.4 Mt | 0.68 % Cu |
| Total | 96.4 Mt | 0.7 avg |
| Category | Tonnes | Grade |
|---|---|---|
| Indicated | 74.0 Mt | 0.6 % Cu |
| Inferred | 38.0 Mt | 0.6 % Cu |